Wednesday, 23 February 2011

Jackson's Landing

It seems as though all is not as was intended at Jackon's Landing. Go to http://jacksonslanding.net.au/node/496 and follow the links to the Community conversation notes (PP file).

As a comment below, answer the following questions.

What are the (8) amended items from the master plan (2003) that are still to be completed?

Outline three problems that have been experienced at Jackson's Landing.

What (if anything) has been done to fix these issues?

Is this community action an example of that of an active civil society? (see p. 146 - TB)

How have individuals (tried) to make a difference here?

21 comments:

  1. For H/W, complete the above Q's, as well as any of those which you may have not finished in class.

    7.6 (p. 163) p. 1-7, 11.

    ReplyDelete
  2. What are the (8) amended items from the master plan (2003) that are still to be completed?
    The eight amended items from the master plan (2003) that are still to be completed are:
    • Work‐based childcare facility
    • Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    • Marked commuter cycle route on Bowman, John & Jones Sts
    • Extension of fiber optic cable from Harris Street to provide
    telephone and data transfer services
    • Playground facilities
    • 3 sections of boardwalk
    • Public berthing facility in Elizabeth Bay


    Outline three problems that have been experienced at Jackson's Landing.

    • Water ingress
    • Sewer
    • Air-conditioning

    What (if anything) has been done to fix these issues?

    • Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years).
    • Sewer – had taken LL to court.
    • Air-conditioning – replaced 50% of compressors.


    How have individuals (tried) to make a difference here?

    Individuals have obviously tried to make a difference here by complaining to LL on many problems; some of which are still not fixed, such as the complaint on air conditioning, water ingress, air- conditioning, and the sewer, which led to a law suit.

    Is this community action an example of that of an active civil society? (see p. 146 - TB)

    Yes, this community action is an example of an active civil society because this community action involves the cooperation of over 200 angry owners, and the action that they had acted upon LL in response to the sewer not being fixed was for their own benefits. It was an issue that affected possibly all or most of these home owners.


    {Jesse Thai}

    ReplyDelete
  3. 1.Wharf in front of Reflections, Marked commuter cycle route on Bowman, John & Jones Sts, Work‐based childcare facility, Clearly defined foreshore recreational cycle path to minimize conflict between pedestrians and cyclists, Playground facilities, Extension of fiber optic cable from Harris Street to provide
    telephone survive, 3 sections of boardwalk and Public berthing facility in Elizabeth Bay.

    2.Not enough space, No disabled access to RSM office, The Station was intended as a “Clubhouse”.

    3.There haven’t tried to fix these issues except people asking them questions such as how do we get them fixed? Etc.

    4.Yes it is it’s a group of NGOs such as national council of churches and green peace and many more.

    5.Individuals have tried by asking several questions.

    ReplyDelete
  4. 1. Retention of wharf in front of Reflections
    Work‐based childcare facility 
    Clearly defined foreshore recreational cycle path to minimise conflict between  pedestrians and cyclists
    Marked commuter cycle route on Bowman, John & Jones Sts
    Extension of fibre optic cable from Harris Street to provide  telephone and data transfer services 
    Playground facilities 
    3 sections of boardwalk 
    Public berthing facility in Elizabeth Bay

    2. Not enough space
    The Station was intended as a “Clubhouse”
    It is mainly used for meetings
    Not enough space for security and RSM in Gatehouse
    Not enough meeting rooms for all stratas and committees
    Not enough space in Glasshouse gym to meet demand

    3. Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years).
    Sewer – had taken LL to court.
    Air-conditioning – replaced 50% of compressors.

    4. Many people have been complaining.

    5. People asked questions

    ReplyDelete
  5. Oh sorry that one was mine

    Peter Pham ^^

    ReplyDelete
  6. 1.
     Retention of wharf in front of Reflections
     Work‐based childcare facility
     Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
     Marked commuter cycle route on Bowman, John & Jones Sts
     Extension of fibre optic cable from Harris Street to provide
    telephone and data transfer services
     Playground facilities
     3 sections of boardwalk
    2. Three problems that had been experienced at Jaksons landing are not enough meeting rooms, lack of disabled access and not enough space for security.
    3. Nothing had been done to fix these issues.
    4. The community is an example of an active civil society because they are taking in action in helping their community.
    5. The ways that individuals had tried to make a difference is such as how the friends of Pyrmont action group had. This group organized a rally to campaign the return of the water police.

    ReplyDelete
  7. Jackson’s landing
    1. What are the (8) amended items from the master plan (2003) that are still to be completed?
    • Retention of wharf in front of reflections
    • Work-basedchildcare facility
    • Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    • Marked commuter cycle route on Bowman, John and Jones Sts
    • Extension of fibre optic cable from Harris Street to provide telephone and data transfer services
    • Play ground facilities
    • 3 sections of boardwalk
    • Public berthing facility in Elizabeth Bay
    2. Outline three problems that have been experienced at Jackson's Landing.
    • Water ingress
    • Sewerage
    • Air-conditioning.
    3. What (if anything) has been done to fix these issues?
    • Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years).
    • Sewer – had taken LL to court.
    • Air-conditioning – replaced 50% of compressors.
    4. Is this community action an example of that of an active civil society?
    • Yes because they participate in helping out each other place.
    5. How have individuals (tried) to make a difference here?
    • Individuals tried by asking various questions.

    BY MICHAEL DUONG! HAR HAR!

    ReplyDelete
  8. 1/The 8 amended items of the master plan that are still to be completed are:
     Retention of wharf in front of Reflections
     Work‐based childcare facility
     Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
     Marked commuter cycle route on Bowman, John & Jones Sts
     Extension of fibre optic cable from Harris Street to provide
    telephone and data transfer services
     Playground facilities
     3 sections of boardwalk
     Public berthing facility in Elizabeth Bay
    2/The three problems experienced at Jackson Landing are:
    • Not enough space
    • The station was intended as a “clubhouse”
    • Lack of disabled access

    3/Things that are fixing these issues are
    • Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years).
    • Sewer – had taken LL to court.
    • Air-conditioning – replaced 50% of compressors.

    4/This community action is an example of an active civil society in this community, because it proves that the residents here care about the problems that are going to affect them and show that they want change in these problems.
    5/ many individuals have tried to make a difference by complaining to the LL and obviously they haven’t taken any action so law suits have occured

    ReplyDelete
  9. William Georgiou
    1/The 8 amended items of the master plan that are still to be completed are:
    - Retention of wharf in front of Reflections
    - Work‐based childcare facility
    - Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    - Marked commuter cycle route on Bowman, John & Jones Sts
    -Extension of fibre optic cable from Harris Street to provide
    telephone and data transfer services
    -Playground facilities
    - 3 sections of boardwalk
    - Public berthing facility in Elizabeth Bay
    2/The three problems experienced at Jackson Landing are:
    • Not enough space
    • The station was intended as a “clubhouse”
    • Lack of disabled access

    3/Things that are fixing these issues are
    • Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years).
    • Sewer – had taken LL to court.
    • Air-conditioning – replaced 50% of compressors.

    4/This community action is an example of an active civil society in this community, because it proves that the residents here care about the problems that are going to affect them and show that they want change in these problems.
    5/ many individuals have tried to make a difference by complaining to the LL and obviously they haven’t taken any action so law suits have occured

    ReplyDelete
  10. 1.What are the (8) amended items from the master plan (2003) that are still to be completed?
    -Retention of wharf in front of Reflections
    -Work‐based childcare facility
    -Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    -Marked commuter cycle route on Bowman, John & Jones Sts
    -Extension of fibre optic cable from Harris Street to provide
    -telephone and data transfer services
    -Playground facilities
    -3 sections of boardwalk

    2. Outline three problems that have been experienced at Jackson's Landing.
    The three problems that have been experienced are 1. There Is not enough space 2. Not enough meeting room’s 3.not enough disable access.

    3. What (if anything) has been done to fix these issues?
    They have tried fixing the issues by fixing air conditioning problems.

    4. Is this community action an example of that of an active civil society? (see p. 146 - TB)
    Yes the community action is an example of an active civil society.

    5. How have individuals (tried) to make a difference here?
    Individuals have tried to make a difference by being involved.


    - THIEN FRANK NGUYEN.

    ReplyDelete
  11. 1.)
    • Retention of wharf in front of reflections
    • Work-basedchildcare facility
    • Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    • Marked commuter cycle route on Bowman, John and Jones Sts
    • Extension of fibre optic cable from Harris Street to provide telephone and data transfer services
    • Play ground facilities
    • 3 sections of boardwalk
    • Public berthing facility in Elizabeth Bay
    2.)
    Not enough space for security and RSM in Gatehouse
    Not enough meeting rooms for all stratas and committees
    Not enough space in Glasshouse gym to meet demand.
    3.)
    the LL promised to fix them but the did'nt.
    4.)
    yes because people in the community tend to help eachother.
    5.)
    The people tried to make some differences by complaining to the LL.

    joe abi khalil <3

    ReplyDelete
  12. What are the (8) amended items from the master plan (2003) that are still to be completed?

    The 8 amended items from the master plan that are needed to be completed are:
    *Retention of wharf in front of Reflections
    *Work-based childcare facility
    *Clearly Defined foreshore recreational cycle path to minimize conflict between pedestrians and cyclists.
    *Marked commuter cycle route on Bowman, John and Jones Sts.
    *Extension of fibre optic cable from Harris Street to provide telephone and data transfer services.
    *Playground facilities
    *3 sections of boardwalk
    *Public berthing facility in Elizabeth Bay



    Outline three problems that have been experienced at Jackson's Landing.

    The three problems that have been experience at Jacksons Landing are: Water ingress, Sewer and Air conditioning.

    What (if anything) has been done to fix these issues?

    The problem being done to fix the Jackson Landing experience are them still not being fixed or if so Air conditioning-replaced 50% of Compressors.


    Is this community action an example of that of an active civil society?

    The people in the community have been questioning about the problem being done about the action being made for the Jackson Landings.


    How have individuals (tried) to make a difference here?

    How do individuals tried to make a difference is trying to asking about getting the things fixed within the community and having law suits on the aim of fixing of air conditioning or sewers when they have not yet been done.

    ReplyDelete
  13. The eight amended items from the master plan (2003) that are still to be completed are:
    • Work‐based childcare facility
    • Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    • Public berthing facility in Elizabeth Bay
    • Extension of fiber optic cable from Harris Street to provide
    telephone and data transfer services
    • 3 sections of boardwalk
    • Playground facilities
    • Marked commuter cycle route on Bowman, John & Jones Sts
    Outline three problems that have been experienced at Jackson's Landing.
    1. Air-conditioning
    2. Sewer
    3. Water ingress
    What (if anything) has been done to fix these issues?
     Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years).
     Sewer – had to take LL to court – costs over $700,000 – still not fixed (7 years).
     Air-conditioning – replaced 50% of compressors
    How have individuals (tried) to make a difference here?
    Individuals have tried to make a difference here by complaining to LL on many problems, and some of them aren’t even fixed, such as the complaint on air conditioning, water ingress, air- conditioning, and the sewer, which led to a law suit.
    Is this community action an example of that of an active civil society?
    Yes, this community’s action is an example of an active civil society due to this community’s action involves the cooperation of over 200 angry owners, and the action that they had acted upon LL in response to the sewer not being fixed was for their own benefits.
    _(SANDRO)_ 

    ReplyDelete
  14. The 8 amended items from the master plan that are needed to be completed are:
    *Retention of wharf in front of Reflections
    *Work-based childcare facility
    *Clearly Defined foreshore recreational cycle path to minimize conflict between pedestrians and cyclists.
    *Marked commuter cycle route on Bowman, John and Jones Sts.

    2. There isn't enough space for security and RSM in Gatehouse
    There aren't enough meeting rooms for all stratas and committees
    Not enough space in Glasshouse gym to meet demand.

    3. These issues can be solved by fixing the water ingress, the sewer and air condition
    *Extension of fibre optic cable from Harris Street to provide telephone and data transfer services.
    *Playground facilities
    *3 sections of boardwalk
    *Public berthing facility in Elizabeth Bay.

    4. This community action is an example of that of an active civil society because they show great concert with their neighbourhood and their facilities.

    5. Individuals have tried solving the issues by contributing and helping out.

    TAPWATER!

    ReplyDelete
  15. 1
    Retention of wharf in front of Reflections
    Work‐based childcare facility
    clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    marked commuter cycle route on Bowman, John & Jones St
    Xtension of fibre optic cable from Harris Street to provide
    telephone and data transfer services
    Playground facilities
    3 sections of boardwalk
    Public berthing facility in Elizabeth Bay
    2
    There is not enough space
    Not enough rooms for where they have meetings at
    Not enough disables access.
    3
    There haven’t tried to fix these issues except people asking them questions such as how do we get them fixed
    4
    It is it’s a group of NGOs such as national council of churches and green peace and many more
    5
    They tried by asking them heaps of questions



    By albert kava

    ReplyDelete
  16. ACV (Adrian Walker)

    What are the (8) amended items from the master plan (2003) that are still to be completed?
    1) Three sections of boardwalk.
    2) Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists.
    3) Marked commuter cycle route on Bowman, John and Jones Sts.
    4) Playground Facilities.
    5) Public berthing facility in Elizabeth bay.
    6) Work based childcare facility.
    7) Extension of fibre optical cable from Harris St. To provide telephone and data transfer services.
    8) Water Ingress.

    Outline three problems that have been experienced at Jackson’s Landing.
    1) Sewer
    2) Water Ingress
    3) Air-conditioning

    What (if anything) has been done to fix these things/ issues?
    1) Sewer - LL has been taken to court.
    2) Water Ingress- LL has made attempts to fix since 2002 – still not fixed. (9years)
    3) Air-conditioning- replaced 50% of compressors.

    Is this community action an example of that of an active civil society?
    This community action is an example of an active civil society in this community, because it proves that the residents here care about the problems that are going to affect them and show that they want change in these problems.

    How have individuals (tried) to make a difference here?
    Many individuals have tried to make a difference by complaining.

    BY: THE ONE THEE ONLY..... Adrian Walker.

    ReplyDelete
  17. Raizec said

    What are 8 amended items from the master plan 2003 that are still to be completed?

    Retention of wharf in front of Reflections

    Work based childcare facility

    Playground facilities

    3 sections of boardwalk

    Public berthing facility in Elizabeth Bay

    Extension of fibre optic cable from Harris street to provide telephone and data transfer services

    Clearly defined foreshore recreational cycle path to minimize conflict between pedestrians and cyclists

    Marked commuter cycle route on Bowmen, John and Jones street

    Outline 3 problems that have been experienced at Jackson’s Landing

    Water ingress

    Sewer

    Air conditioning


    What (if anything) has been done to fix these issues

    Water ingress LL has made attempts to fix since 2002 and still not fixed for about 9 years

    Sewer had taken LL to court

    Air Conditioning replaced 50% of compresses

    Is this community action an example of that of an active civil society

    Yes it is because they are trying to help out other places

    How do individuals (tried) to make a difference

    Individuals have tried solving the issues by helping out

    By Raizec

    ReplyDelete
  18. 1)The 8 items of the master plan that are still to be completed are:
    . Retention of wharf in front of Reflections
    . Work‐based childcare facility
    . Defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    . Marked commuter cycle route on Bowman, John & Jones Sts
    . Extension of fibre optic cable from Harris Street to provide
    telephone and data transfer services
    . Playground facilities for children
    . 3 sections of boardwalk
    . Public berthing facility in Elizabeth Bay
    2)The three problems experienced at Jackson Landing are:
    . Not enough space
    . The station was intended as a “clubhouse”
    . Lack of disabled access areas

    3)Things that are fixing these issues are:
    . Water ingress – LL has made attempts to fix since 2002– still not fixed (9 years) later.
    . Sewer – had taken LL to court.
    . Air-conditioning – replaced 50% of compressors.

    4)The community action is an example of an active society in the community, because it proves that the residents here care about the problems that are going to affect them and show that they want change in these problems.
    5) many individuals have tried to make a difference by complaining to the LL and obviously they haven’t taken any action

    Daniel Zucchetto (Zucchey)

    ReplyDelete
  19. What are the (8 amended items from the master plan (2003) that are still to be completed?
     The 8 amended items from the master plan of 2003 that still needed to be completed was:
     Retention of wharf in front of Reflections
     Work‐based childcare facility
     Reconstructing roads for pedestrians and cyclers.
     Marked commuter cycle route on Bowman, John & Jones Sts
     Extension of fiber optic cable from Harris Street to provide
    telephone and data transfer services
     Playground facilities
     3 sections of boardwalk
     Public berthing facility in Elizabeth Bay
    Outline three problems that have been experienced at Jackson's Landing.
    The 3 problems that have been experienced at the Jackson’s Landing was:
    • That the water ingress was really hard to fix as known that it had took many attempts to fix since 2002.
    • The sewer, it took the LL to court and has still not been fixed for 7 years and it cost over 700,000 $.
    • And last but not least the Air conditioning it replaced 50% of the compressors.

    What (if anything) has been done to fix these issues?
    The things that have been fixed between the years 2004 till now that has been known to be fixed was the sewer stacks that leaked into units it got fixed on the year 2006.
    Is this community action an example of that of an active civil society? (see p. 146 - TB)
    Yes the fact that around 200 people were working together to make their society a better place, they together tried to do something about the sewage, the air conditioning and many more and together complained to the LL for their mistakes.
    How have individuals (tried) to make a difference here?
    The individuals mostly tried to make a difference but the most of the things they have done is asked questions.

    ReplyDelete
  20. What are the (8) amended items from the master plan (2003) that are still to be completed?
    The eight amended items from the master plan (2003) that are still to be completed are:
    • Work‐based childcare facility
    • Clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    • Marked commuter cycle route on Bowman, John & Jones Sts
    • Extension of fiber optic cable from Harris Street to provide
    telephone and data transfer services
    • Playground facilities
    • 3 sections of boardwalk
    • Public berthing facility in Elizabeth Bay

    2.Not enough space, No disabled access to RSM office, The Station was intended as a “Clubhouse”.
    3.What (if anything) has been done to fix these issues?
    there is not enough room and they need to make more places to work .
    4.Is this community action an example of that of an active civil society? (see p. 146 - TB)
    This community action is an example of an active civil society in this community, because it shows that the residents here show compassion about the problems that are going to affect them and they have to show these problems.
    5.How have individuals (tried) to make a difference here?
    they have tried by making complainets and asking people to follow them to fix the problem
    - by. Safi

    ReplyDelete
  21. 1
    Retention of wharf in front of Reflections
    Work‐based childcare facility
    clearly defined foreshore recreational cycle path to minimise conflict between pedestrians and cyclists
    marked commuter cycle route on Bowman, John & Jones St
    Xtension of fibre optic cable from Harris Street to provide
    telephone and data transfer services
    Playground facilities
    3 sections of boardwalk
    Public berthing facility in Elizabeth Bay
    2
    There is not enough space
    Not enough rooms for where they have meetings at
    Not enough disables access.
    3
    There haven’t tried to fix these issues except people asking them questions such as how do we get them fixed
    4
    It is it’s a group of NGOs such as national council of churches and green peace and many more
    5??
    Nicholas.maalouf